{"id":1143,"date":"2024-11-29T12:00:00","date_gmt":"2024-11-29T12:00:00","guid":{"rendered":"https:\/\/pangealtda.cl\/?p=1143"},"modified":"2026-07-17T22:12:44","modified_gmt":"2026-07-18T02:12:44","slug":"etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion","status":"publish","type":"post","link":"https:\/\/pangeageotecnia.com\/en\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/","title":{"rendered":"Stage III of the Berlin-type retaining wall construction \u2013 Futuro Carrera building, Concepci\u00f3n"},"content":{"rendered":"<p class=\"wp-block-paragraph\">In this third stage of the project, we are constructing an anchored Berlin-type retaining wall, a geotechnical solution commonly used to provide ground support during deep excavations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At this stage, we are carrying out the drilling and installation of ground anchors, a critical process for ensuring the stability and safety of the retaining system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Drilling and ground anchor installation process<br><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Drilling the borehole\n\nWe use the cased drilling method, in which an outer casing is installed to stabilize the borehole during drilling. At the same time, an inner drill string is used to inject water, facilitating excavation and removing the drilled material.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Removal of the casing\n\nOnce the required depth has been reached, the drilling equipment and casing are withdrawn, leaving the borehole ready for the next stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Installation of the ground anchor\n\nWith the borehole prepared, the ground anchor is installed in its final position, ensuring it is correctly placed to resist the design loads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Grouting\n\nAs the final step, the borehole is filled with cement grout, which bonds the anchor to the surrounding ground and provides the long-term structural performance of the anchoring system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Watch the video below to see the construction process in action.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/7466qRfEv8M?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><figcaption class=\"wp-element-caption\">\ud83c\udfac Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n.<br><\/figcaption><\/figure>\n\n\n\n<p class=\"has-text-color has-link-color wp-elements-1ebdc4a0a48e7aef2564547befac88d3 wp-block-paragraph\" style=\"color:#8f8f8f\">You may also be interested in\u2026<\/p>\n\n\n\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-7387b849 wp-block-group-is-layout-flex\">\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-pangea-geotecnia wp-block-embed-pangea-geotecnia\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"6aOE4eHgWn\"><a href=\"https:\/\/pangeageotecnia.com\/en\/2024\/10\/22\/etapa-i-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/\">Stage I of the Berlin-type retaining wall construction \u2013 Futuro Carrera building, Concepci\u00f3n<\/a><\/blockquote><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u00abEtapa I de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n.\u00bb \u2014 Pangea Geotecnia\" src=\"https:\/\/pangeageotecnia.com\/2024\/10\/22\/etapa-i-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/embed\/#?secret=EVwQjG9gPh#?secret=6aOE4eHgWn\" data-secret=\"6aOE4eHgWn\" width=\"500\" height=\"282\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-pangea-geotecnia wp-block-embed-pangea-geotecnia\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"X0PCHHqKgE\"><a href=\"https:\/\/pangeageotecnia.com\/en\/2024\/11\/07\/etapa-ii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/\">Stage II of the Berlin-type retaining wall construction \u2013 Futuro Carrera building, Concepci\u00f3n<\/a><\/blockquote><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u00abEtapa II de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n.\u00bb \u2014 Pangea Geotecnia\" src=\"https:\/\/pangeageotecnia.com\/2024\/11\/07\/etapa-ii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/embed\/#?secret=It45FEXKuG#?secret=X0PCHHqKgE\" data-secret=\"X0PCHHqKgE\" width=\"500\" height=\"282\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">This process ensures the stability of the Berlin-type retaining wall, a retaining solution that combines safety, efficiency, and long-term performance in ground retention projects.\n\nAt Pangea Geotecnia, we are committed to maintaining the highest quality standards throughout every stage of the construction process on each of our projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>En esta tercera etapa estamos desarrollando un proyecto que involucra la construcci\u00f3n de un muro Berl\u00edn\u00e9s anclado, una soluci\u00f3n com\u00fanmente utilizada en obras de estabilizaci\u00f3n de terrenos. Actualmente, nos encontramos en la etapa de perforaci\u00f3n e instalaci\u00f3n de los anclajes, un proceso importante para garantizar la seguridad y estabilidad de la estructura. Proceso de Perforaci\u00f3n [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1144,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-1143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-avances-de-obra"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n. - Pangea Geotecnia<\/title>\n<meta name=\"description\" content=\"En esta etapa estamos desarrollando un proyecto que involucra la construcci\u00f3n de un muro Berl\u00edn\u00e9s en el edificio futuro carrera en concepci\u00f3n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pangeageotecnia.com\/en\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n. - Pangea Geotecnia\" \/>\n<meta property=\"og:description\" content=\"En esta etapa estamos desarrollando un proyecto que involucra la construcci\u00f3n de un muro Berl\u00edn\u00e9s en el edificio futuro carrera en concepci\u00f3n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pangeageotecnia.com\/en\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/\" \/>\n<meta property=\"og:site_name\" content=\"Pangea Geotecnia\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-29T12:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-18T02:12:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pangeageotecnia.com\/wp-content\/uploads\/2024\/12\/iii-jeanpaul-1024x686.gif\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"686\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/gif\" \/>\n<meta name=\"author\" content=\"Pangea Geotecnia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pangea Geotecnia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/\"},\"author\":{\"name\":\"Pangea Geotecnia\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#\\\/schema\\\/person\\\/7684aea57873fba0bde57419fb71ffb4\"},\"headline\":\"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n.\",\"datePublished\":\"2024-11-29T12:00:00+00:00\",\"dateModified\":\"2026-07-18T02:12:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/\"},\"wordCount\":320,\"publisher\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pangeageotecnia.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/iii-jeanpaul.gif\",\"articleSection\":[\"Avances de obra\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/\",\"url\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/\",\"name\":\"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n. - Pangea Geotecnia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pangeageotecnia.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/iii-jeanpaul.gif\",\"datePublished\":\"2024-11-29T12:00:00+00:00\",\"dateModified\":\"2026-07-18T02:12:44+00:00\",\"description\":\"En esta etapa estamos desarrollando un proyecto que involucra la construcci\u00f3n de un muro Berl\u00edn\u00e9s en el edificio futuro carrera en concepci\u00f3n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/pangeageotecnia.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/iii-jeanpaul.gif\",\"contentUrl\":\"https:\\\/\\\/pangeageotecnia.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/iii-jeanpaul.gif\",\"width\":1138,\"height\":762},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/2024\\\/11\\\/29\\\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/pangeageotecnia.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#website\",\"url\":\"https:\\\/\\\/pangeageotecnia.com\\\/\",\"name\":\"Pangea Ltda\",\"description\":\"Ingenier\u00eda, miner\u00eda y construcci\u00f3n\",\"publisher\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pangeageotecnia.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#organization\",\"name\":\"Pangea Ltda\",\"url\":\"https:\\\/\\\/pangeageotecnia.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/pangealtda.cl\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/logo-bgwhite.png\",\"contentUrl\":\"https:\\\/\\\/pangealtda.cl\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/logo-bgwhite.png\",\"width\":500,\"height\":500,\"caption\":\"Pangea Ltda\"},\"image\":{\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pangea-ltda\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pangeageotecnia.com\\\/#\\\/schema\\\/person\\\/7684aea57873fba0bde57419fb71ffb4\",\"name\":\"Pangea Geotecnia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0e94f57fc02c663dff5ac0f5efe447ded867888619c2f35a8c983bb5b6bb763d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0e94f57fc02c663dff5ac0f5efe447ded867888619c2f35a8c983bb5b6bb763d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0e94f57fc02c663dff5ac0f5efe447ded867888619c2f35a8c983bb5b6bb763d?s=96&d=mm&r=g\",\"caption\":\"Pangea Geotecnia\"},\"url\":\"https:\\\/\\\/pangeageotecnia.com\\\/en\\\/author\\\/adminpangea\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n. - Pangea Geotecnia","description":"En esta etapa estamos desarrollando un proyecto que involucra la construcci\u00f3n de un muro Berl\u00edn\u00e9s en el edificio futuro carrera en concepci\u00f3n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pangeageotecnia.com\/en\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/","og_locale":"en_US","og_type":"article","og_title":"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n. - Pangea Geotecnia","og_description":"En esta etapa estamos desarrollando un proyecto que involucra la construcci\u00f3n de un muro Berl\u00edn\u00e9s en el edificio futuro carrera en concepci\u00f3n.","og_url":"https:\/\/pangeageotecnia.com\/en\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/","og_site_name":"Pangea Geotecnia","article_published_time":"2024-11-29T12:00:00+00:00","article_modified_time":"2026-07-18T02:12:44+00:00","og_image":[{"width":1024,"height":686,"url":"https:\/\/pangeageotecnia.com\/wp-content\/uploads\/2024\/12\/iii-jeanpaul-1024x686.gif","type":"image\/gif"}],"author":"Pangea Geotecnia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Pangea Geotecnia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/#article","isPartOf":{"@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/"},"author":{"name":"Pangea Geotecnia","@id":"https:\/\/pangeageotecnia.com\/#\/schema\/person\/7684aea57873fba0bde57419fb71ffb4"},"headline":"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n.","datePublished":"2024-11-29T12:00:00+00:00","dateModified":"2026-07-18T02:12:44+00:00","mainEntityOfPage":{"@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/"},"wordCount":320,"publisher":{"@id":"https:\/\/pangeageotecnia.com\/#organization"},"image":{"@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/#primaryimage"},"thumbnailUrl":"https:\/\/pangeageotecnia.com\/wp-content\/uploads\/2024\/12\/iii-jeanpaul.gif","articleSection":["Avances de obra"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/","url":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/","name":"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n. - Pangea Geotecnia","isPartOf":{"@id":"https:\/\/pangeageotecnia.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/#primaryimage"},"image":{"@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/#primaryimage"},"thumbnailUrl":"https:\/\/pangeageotecnia.com\/wp-content\/uploads\/2024\/12\/iii-jeanpaul.gif","datePublished":"2024-11-29T12:00:00+00:00","dateModified":"2026-07-18T02:12:44+00:00","description":"En esta etapa estamos desarrollando un proyecto que involucra la construcci\u00f3n de un muro Berl\u00edn\u00e9s en el edificio futuro carrera en concepci\u00f3n.","breadcrumb":{"@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/#primaryimage","url":"https:\/\/pangeageotecnia.com\/wp-content\/uploads\/2024\/12\/iii-jeanpaul.gif","contentUrl":"https:\/\/pangeageotecnia.com\/wp-content\/uploads\/2024\/12\/iii-jeanpaul.gif","width":1138,"height":762},{"@type":"BreadcrumbList","@id":"https:\/\/pangeageotecnia.com\/2024\/11\/29\/etapa-iii-de-construccion-muro-berlines-edificio-futuro-carrera-concepcion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/pangeageotecnia.com\/"},{"@type":"ListItem","position":2,"name":"Etapa III de construcci\u00f3n muro berlin\u00e9s, edificio Futuro Carrera, Concepci\u00f3n."}]},{"@type":"WebSite","@id":"https:\/\/pangeageotecnia.com\/#website","url":"https:\/\/pangeageotecnia.com\/","name":"Pangea Ltda","description":"Ingenier\u00eda, miner\u00eda y construcci\u00f3n","publisher":{"@id":"https:\/\/pangeageotecnia.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pangeageotecnia.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pangeageotecnia.com\/#organization","name":"Pangea Ltda","url":"https:\/\/pangeageotecnia.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pangeageotecnia.com\/#\/schema\/logo\/image\/","url":"https:\/\/pangealtda.cl\/wp-content\/uploads\/2024\/07\/logo-bgwhite.png","contentUrl":"https:\/\/pangealtda.cl\/wp-content\/uploads\/2024\/07\/logo-bgwhite.png","width":500,"height":500,"caption":"Pangea Ltda"},"image":{"@id":"https:\/\/pangeageotecnia.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/pangea-ltda\/"]},{"@type":"Person","@id":"https:\/\/pangeageotecnia.com\/#\/schema\/person\/7684aea57873fba0bde57419fb71ffb4","name":"Pangea Geotecnia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0e94f57fc02c663dff5ac0f5efe447ded867888619c2f35a8c983bb5b6bb763d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0e94f57fc02c663dff5ac0f5efe447ded867888619c2f35a8c983bb5b6bb763d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0e94f57fc02c663dff5ac0f5efe447ded867888619c2f35a8c983bb5b6bb763d?s=96&d=mm&r=g","caption":"Pangea Geotecnia"},"url":"https:\/\/pangeageotecnia.com\/en\/author\/adminpangea\/"}]}},"_links":{"self":[{"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/posts\/1143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/comments?post=1143"}],"version-history":[{"count":7,"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/posts\/1143\/revisions"}],"predecessor-version":[{"id":2637,"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/posts\/1143\/revisions\/2637"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/media\/1144"}],"wp:attachment":[{"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/media?parent=1143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/categories?post=1143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pangeageotecnia.com\/en\/wp-json\/wp\/v2\/tags?post=1143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}