Project update – Huertos project, San Pedro de la Paz

At Pangea Geotecnia, every project represents a challenge that we approach with commitment, experience, and technical precision.

Our latest progress on the Huertos Project, located in San Pedro de la Paz as part of a major development for EBCO, once again demonstrates our ability to adapt to our client's specific requirements.

On this project, we are constructing an anchored Berlin-type retaining wall, a key geotechnical solution that provides ground stability and enables the safe construction of the building.

Project stages

The client requested that the work be divided into two sections, beginning with Section 2 to facilitate the initial blinding concrete works and early stages of building construction. After successfully completing that phase, we moved on to Section 1, where approximately 50% of the work had been completed at the time this video was recorded.

We have now completed the final borehole and are preparing for the installation of the waler beam, a stage that requires a high level of technical precision. This will be followed by the acceptance testing of the ground anchors, allowing us to continue with the second level of lagging boards and complete this stage of the retaining system.

Innovation and efficiency

Projects like this demonstrate not only our technical capabilities but also our flexibility in adapting to our client's construction sequence, delivering safe and efficient results throughout every stage of the project.

We invite you to watch the full video, where we showcase the field operations, the equipment used, and the progress achieved on this project.

At Pangea Geotecnia, we remain committed to delivering geotechnical solutions that overcome engineering challenges and provide solid foundations for every project.